Quote

From:

Holly Lane, Barwell, Leicestershire, LE9 8BT

Enquiries@HiskinsElectrical.co.uk

Quote Number QUO-3403
Quote Date 3rd April 2024
Valid Until 3rd May 2024
Total £15,464.32
To:
Voestalpine - Chris Brown

Voestalpine Rotec Ltd, 2 Dodwells Bridge Industrial Estate, Jacknell Road, Hinckley, LE10 3BS

Supply and installation of no 3 70mm 5 core SWA XLPE Armoured cables (Total length of 170 meters)

Cables will be supplied only and fixed as discussed between distribution board positions via steel girder system of the building.

This quote is based on out of hours working on a Saturday to suit your business, should you require these works to be carried out on a Sunday, please request an amended quotation.

Hrs/Qty Service Rate/PriceSub Total
1 Labour.

Cost to supply labour to complete works as described above on a Saturday.

£14,714.32£14,714.32
1 Access equipment Hire

Hire of 450kg working weight JLG 460SJHCS - 16.1m Diesel Boom Lift

£750.00£750.00
Sub Total £15,464.32
VAT Not Applicable £0.00