Quote

From:

Holly Lane, Barwell, Leicestershire, LE9 8BT

Enquiries@HiskinsElectrical.co.uk

Quote Number QUO-3607
Quote Date 4th February 2026
Valid Until 4th March 2026
Total £4,879.54
To:
Vision House Properties - Charlie Huddleston

119 Factory Road, Hinckley, LE10 0DP

Quotation for remedial works required with regards to EICR.

DIS1
Observation 7, supply and installation of appropriate cable support above ceiling in main corridor.
Observation 8, supply and installation of bonding cable to incoming water supply pipe.

DIS2
Observation 1, supply and installation of socket to replace faulty Socket, circuit 5L1.
observation 3, 2 hrs of further investigation to address circuit 4L3, No Continuity of Line conductor on Ring final circuit.
Observation 6, Supply and installation of fly leads to metal back boxes Circuits 4L3, 5L1.
Observation 7, 1 hr of further investigation Circuit 5L3, unable to locate any end points.
Observation 9. Circuit 6L2, Supply and installation of correct circuit protection device.
Observation 10 1 hr of further investigation Circuit 6L3, unable to locate end points.
Observation 11, supply and installation of RCBO for circuits 4L1, 4L3, 5L1 and 6L3.
Observation 12, supply and installation of appropriate cable support above ceiling in main corridor.
Observation 14, supply and installation of correct sized main earth cable, circuits 3L2 and 3L3.

DBS1
Observation 2, 1 hr of further investigation, circuit 4, no earth continuity.
Observation 3, 1 hr of further investigation, circuit 3, unable to identify end points.
Observation 4, 1 hr of further investigation, circuit 10, unable to identify end points.

DBS2
Observation 3, supply and installation of switched fused spur.
Observation 9, supply and installation of bonding to Water service pipe.
Observation 12, supply and installation of bonding to Gas service pipe.
Observation 13, 1 hr of further investigation, circuit 8, unable to identify end points.
Observatin14, supply and installation of a replacement circuit breaker.

DBA4
Observation 2, rectification of IP issue.
Observation 3, 1 hr of further investigation, circuit 12, unable to locate end points.
Observation 4, 1 hr of further investigation, circuit 13, unable to locate end points

DB5
Observation 4, Circuit 1L3, accessory not adequately fixed.
Observation 7, Circuit1L3, supply and installation of RCBO.
Observation 9, Circuit 1L3, supply and installation of correct circuit protection device.

DB6
Observation 1, supply and installation of replacement back box and socket face.
Observation 3, 2 hrs of further investigation, 3 sockets in kitchen area which are not isolatable from DB6.
Observation 6, 2 hrs of further investigation, circuit 5, very high and out of acceptable range for circuit R1+R2 (ELI).

Hrs/Qty Service Rate/PriceSub Total
1 Materials and Labour.

Cost to supply materials and labour to install them to complete works as described above.

£4,879.54£4,879.54
Sub Total £4,879.54
VAT Not Applicable £0.00
Total £4,879.54