You have accepted this Quote.

Quote

From:

Holly Lane, Barwell, Leicestershire, LE9 8BT

Enquiries@HiskinsElectrical.co.uk

Quote Number QUO-0010
Quote Date 19th February 2018
Total £2,297.58
To:
Magnum Utilities

Unit A2, The Rise Moat Way Inds, Barwell, LE9 8EY

Job no. MU00004-925

Installation of 10 X switched fused spurs, 10 X  sockets, Trunking and conduit to accommodate required wiring.  Replace current switched fused spur for boiler for an un-switched fused spur. Testing and certification for new circuits.  This work will be completed in approx 3 days providing no issues arise, at the present time this work can be started Wednesday 21/2/18 and completed on Monday and Tuesday of the following week.

Note: Price includes a new consumer unit and accessories which may not be required, this will be removed from final price if this is the case.  These are marked with * in the detail below.

Hrs/Qty Service Rate/PriceSub Total
1 Initial Inspection & Testing

Included in price

£0.00£0.00
1 Required material

Description Qty Cost
Metal Switched fused spur with Box 10 6.6
Metal Un-Switched Fused Spur with box 1 5.4
100mm Galv Trunk 4 93.6
Normally closed Emergency Stop buttons 10 95.4
Normally Open Lockable Emergency Stop Button with back box 1 16.2
25mm pvc conduit white 9 19.44
Galv Trunk 90 Bends 2 20.4
GCA44 2 6
Female conduit bush 1 21
13 Amp RCD single 10 252
Conduit Saddles 1 18
PVC Sinlge Neutral 1 23.4
PVC Single Line 1 23.4
CPC 1 23.4
63A 2 pole RCD 1 30
*Hager 10 way 1 78
*Line Tail 1 13.2
*Neutral Tail 1 13.2
*CPC Tail 1 13.2
32 A Type B MCB 2 6
Plaster fix 1 9.54
Self Drill Screws 1 10.2

* These items may not be required

£797.58£797.58
3 3 day's Labour for 1 electrician and 1 electricians labourer
£480.00£1,440.00
1 Final Inspection, Testing & certification

Ensure new circuits meet 18th Edition regulations, issue of a new installation certificate

£60.00£60.00
Sub Total £2,297.58
VAT Not Applicable £0.00
Total £2,297.58