Quote

From:

Holly Lane, Barwell, Leicestershire, LE9 8BT

Enquiries@HiskinsElectrical.co.uk

Quote Number QUO-3459
Quote Date 26th September 2024
Valid Until 26th October 2024
Total £6,625.34
To:
AW Technology David Haigh

West Street, Earl Shilton, LE9 7EJ

Quotation for remedial works at AW Technology new premises as follows-

Incoming Supply

Supply and installation of  Type 1 surge protection device.

DB1

1 hour of labour to investigate observation 1, Zdb at DB1 Is higher than would be expected

Supply and installation of RCBO for DB1 lighting circuit.

Supply and installation of RCBO for DB1 socket circuits rated up to 32A.

Supply and installation of correct circuit breaker DB1 circuit 1L1.

Supply and installation of 2 new metal clad sockets and back boxes DB1 circuit 1L1.

Supply and installation of 1 new metal clad socket, DB1 Circuit 2L2.

2 hours of labour to investigate observation 7, DB3 circuit 4L2, No continuity of ring final circuit.

Supply and installation of replacement EML test switch.

Supply and installation of correct cable type for exterior lights.

Rectification of Hole in DB1, Condition of enclosure(s) in terms of IP rating.

re-labelling of circuit as required and addition of RCD test notice.

DB2

Supply and installation of correct circuit breaker DB2 3L2,

Supply and installation of correct circuit breaker DB3 1L1.

Supply and installation of RCBO for DB2 lighting circuits x 7.

DB3,

Supply and installation of replacement distribution board.

Supply and installation of switched fused spur, observation 31.

2 hour of labour to investigate observation 32, DB1 Circuit 2L2, high R2 value measured.

2 hours of labour to investigate observation 33, DB2 Circuit 2L3, low R2 value measured.

2 hours of labour to investigate observation 34. DB2 Circuit 6L2, High ELI value measured.

2 hours of labour to investigate observation 35 DB3 Circuit 4L2, No continuity of any of the 3 conductors in the Ring Final circuit.

Hrs/Qty Service Rate/PriceSub Total
1 Materials and Labour.

Cost to supply materials and labour to install them to complete works as described above.

£6,625.34£6,625.34
1 Testing and certification as required to comply with Part P of the building regulation including notification to your local authority.

Included as part of our service.

£0.00£0.00
Sub Total £6,625.34
VAT Not Applicable £0.00
Total £6,625.34